EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

SR-9 / I-95 at 10th Avenue North Interchange PD&E Study

Project Home / Alternatives Public Workshop - Virtual Open House

Alternatives Public Workshop - Virtual Open House

Available Beginning October 7, 2020

The FDOT, District Four, is currently conducting a PD&E Study that proposes improvements to the I-95/10th Avenue North interchange located in the City of Lake Worth Beach between Forest Hill Boulevard (1.90 miles to the north) and 6th Avenue South (1.28 miles to the south) interchanges in Palm Beach County, Florida. The South Florida Rail Corridor (SFRC)/CSX Railroad runs parallel along the west side of I-95 in this area and crosses below an elevated section of 10th Avenue North. The adjacent accessible signalized intersections relative to the I-95 interchange are at Detroit Street (west), at Barnett Drive (west), and at “A” Street (east).

Click here to read our newsletter

Please Sign In
Alternatives Public Workshop Presentation

Click here to download a PDF of the Alternatives Public Workshop Presentation.

View Our Project Boards

Click here to download a PDF of these boards.

Click here to download a high-resolution PDF of the presented alternatives.

Welcome
Welcome
Title VI
Title VI
NEPA Assignment Memorandum of Understanding
NEPA Assignment Memorandum of Understanding
PD&E Study Process
PD&E Study Process
Summary Schedule
Summary Schedule
Project Location
Project Location
Evaluation Matrix
Evaluation Matrix
Purpose & Need
Purpose & Need
Alternatives Analysis
Alternatives Analysis
Build Alternative 1 - Tight Urban Diamond Interchange (TUDI)
Build Alternative 1 - Tight Urban Diamond Interchange
Build Alternative 2 - Diverging Diamond Interchange (DDI)
Build Alternative 2 - Diverging Diamond Interchange
Proposed Typical Sections - Build Alternative 1
Proposed Typical Sections - Build Alternative 1
Proposed Typical Sections - Build Alternative 2
Proposed Typical Sections - Build Alternative 2
Build Alternative 1 Concept Plans
Build Alternative 1 Concept Plans
Build Alternative 2 Concept Plans
Build Alternative 2 Concept Plans
Diverging Diamond Interchange Videos

Eastbound 10th Avenue Traffic Movement

download video

Eastbound 10th Avenue Pedestrian Movement

download video

Westbound 10th Avenue Traffic Movement

download video

Westbound 10th Avenue Pedestrian Movement

download video

Submit Your Comments